• Nederlands (Dutch)
  • English
  • Deutsch (German)
  • French (Francais)
  • Spanish (Espanol)

Port Authorities

vele kilometers rail zijn nodig voor de geleiding van havenkranen vele kilometers rail zijn nodig voor de geleiding van havenkranen

Miles of rail system zigzag dockland areas all over the world guiding huge gantry cranes that load and unload ever-bigger container ships. AWEJA Railsystemen BV has supplied and installed numerous partial and complete systems at home and abroad. The most common crane track configurations are fully embedded and are laid on continuous bearing plates or on concrete sleepers. The rail type used is dependent on usage and loading.

AWEJA Railsystemen BV is your first port of call for laying, maintaining and repairing dockland and quayside rail systems! If you work for a port authority and you are about to embark on a new project, or if existing rail systems need to be overhauled, then please do not hesitate to contact us by telephone on +31 (0)315 640047 or by e-mail at This e-mail address is being protected from spambots. You need JavaScript enabled to view it and we will gladly schedule an on-site appointment without obligation.

Aweja in short

AWEJA has been a specialist in laying and maintaining various types of rail system for high-ceiling warehousing systems, mini-load warehousing systems, crane tracks, docklands, machinery manufacturers, brickworks, foundries, etc. for over twenty-five years. We have worked and are working in Asia, America, the Middle East, Europe and Australia.

Vacancies

Our references

  • Additional Info
    • Klant: Habasit Belting, Suwanee (USA)
    • Project: rails voor hoogbouwmagazijn
    • Jaar: 2005
more references...