• Nederlands (Dutch)
  • English
  • Deutsch (German)
  • French (Francais)
  • Spanish (Espanol)

Brickworks

Klei wordt over rails naar de steenoven gebracht Klei wordt over rails naar de steenoven gebracht
Brickworks, tile works and other clay processing-sector companies make use of miles of lightweight crane rail to transport their raw materials, semi-finished products and end products as part of their production processes Rail systems are often overhauled or repaired during the summer months. AWEJA Railsystemen BV is the ideal partner for this type of work. We supply the materials required in a pre-fabricated state so that our installers can carry out repairs quickly and efficiently – sometimes this is even possible without shutting down production processes! If you work in this sector and you are about to embark on a new project, or if existing rail systems need to be overhauled, then please do not hesitate to contact us by telephone on +31 (0)315 640047 or by e-mail at This e-mail address is being protected from spambots. You need JavaScript enabled to view it and we will gladly schedule an on-site appointment without obligation.

Aweja in short

AWEJA has been a specialist in laying and maintaining various types of rail system for high-ceiling warehousing systems, mini-load warehousing systems, crane tracks, docklands, machinery manufacturers, brickworks, foundries, etc. for over twenty-five years. We have worked and are working in Asia, America, the Middle East, Europe and Australia.

Vacancies

Our references

  • Additional Info
    • Klant: Phoenix Contact Middletown (USA)
    • Project: Rails hoogbouwmagazijn
    • Jaar: 2011
more references...